伊人大综合,日本18hd,东京热加勒比无码少妇,www.cao

Jiangmen hardware accessories factory analyzes its mold processing process arrangement

2019-12-29 1198

  Mold making refers to the processing of forming and blank making tools, in addition to shear mold and die-cutting mold. Generally, the mold has two parts: upper mold and lower mold. The steel plate is placed between the upper and lower dies to realize the material forming under the action of the press. When the press is opened, the workpiece determined by the die shape will be obtained or the corresponding waste materials will be removed. As small as electronic connector, as large as the automobile dashboard, the workpiece can be molded with mold. Progressive die refers to a set of die which can automatically move the workpiece from one station to another and get the forming parts at the last station. Die processing technology includes: cutting die, blanking die, compound die, extrusion die, four slide die, progressive die, stamping die, die cutting die, etc.

  Process flow arrangement

  1. Bottom surface processing, processing quantity guarantee;

  2. Casting blank datum alignment, 2D and 3D mold surface allowance inspection;

  3. Rough machining of 2D and 3D profile, non installation non working plane (including safety platform surface, buffer installation surface, pressing plate plane and side datum plane);

  4. Before semi finishing, the side datum should be aligned correctly to ensure the accuracy;

  5. Semi finish machining of 2D and 3D profile, finish machining of all kinds of installation working surfaces (including limit block installation surface and contact surface, insert installation surface and back side, punch installation surface, waste cutter installation surface and back side, spring installation surface and contact surface, all kinds of travel limit working surface, wedge installation surface and back side), semi finish machining of all kinds of guide surfaces and guide holes, leaving allowance for finish machining process Datum hole and height datum, and record data;

  6. Check and recheck the machining accuracy;

  7. Fitter setting process;

  8. Before finishing, align the reference surface of the process reference hole and check the allowance of the insert;

  9. Finish machining profile 2D, 3D, side punching profile and hole position, finish machining process reference hole and height reference, finish machining guide surface and guide hole;

  10. Check and recheck the machining accuracy.

  Jiangmen hardware accessories factory http://cyuy.cn//


无套内射人妻| 亚洲AV免费播放| 熟女,丝袜 乱伦 激情| 色狠狠宗合色| 国产伦理一区二区久久精品 | 又粗又粗又黄又硬又深色的| 国产精品一线二线三线| 67avxxxxx| 日本欧美韩国一区| 巨人福巨人福利精品导航APP | 国产精品一区二区毛卡片| 狠狠色婷婷婷| 香蕉视频官网| 欧美精品久久久久a片软件| 亚洲精品乱码久久久久久久久| 九九热九九操| 色吧首页dvd| 乃木坂春香的秘密OVA| 日韩精品无码一本二本三本| 手机在线电影AV| 深夜爽爽无遮无挡视频| AV综合一,二区| 日产精品卡一卡二卡三的概述| 欧美激欧美啪啪片| 国产精华午夜av| 亚洲av免费在线播放| 老熟女操B视频| 人妻斩无码一区| 欧美国产成人免费播放| 国产超高清麻豆精品传媒麻豆精品| 黄频视频大全免费的国产| 激情内射亚州一区二区三区爱妻| 98经典无码| 岛国AV网站| 四虎成人精品永久免费av| 法国极品成人H版| 啪啪啪视频高清| 久久免费视频5| 一区二区 亚洲| 国产一二三四五区| 人人射人人插|