伊人大综合,日本18hd,东京热加勒比无码少妇,www.cao

Jiangmen hardware accessories factory analyzes its mold processing process arrangement

2019-12-29 1198

  Mold making refers to the processing of forming and blank making tools, in addition to shear mold and die-cutting mold. Generally, the mold has two parts: upper mold and lower mold. The steel plate is placed between the upper and lower dies to realize the material forming under the action of the press. When the press is opened, the workpiece determined by the die shape will be obtained or the corresponding waste materials will be removed. As small as electronic connector, as large as the automobile dashboard, the workpiece can be molded with mold. Progressive die refers to a set of die which can automatically move the workpiece from one station to another and get the forming parts at the last station. Die processing technology includes: cutting die, blanking die, compound die, extrusion die, four slide die, progressive die, stamping die, die cutting die, etc.

  Process flow arrangement

  1. Bottom surface processing, processing quantity guarantee;

  2. Casting blank datum alignment, 2D and 3D mold surface allowance inspection;

  3. Rough machining of 2D and 3D profile, non installation non working plane (including safety platform surface, buffer installation surface, pressing plate plane and side datum plane);

  4. Before semi finishing, the side datum should be aligned correctly to ensure the accuracy;

  5. Semi finish machining of 2D and 3D profile, finish machining of all kinds of installation working surfaces (including limit block installation surface and contact surface, insert installation surface and back side, punch installation surface, waste cutter installation surface and back side, spring installation surface and contact surface, all kinds of travel limit working surface, wedge installation surface and back side), semi finish machining of all kinds of guide surfaces and guide holes, leaving allowance for finish machining process Datum hole and height datum, and record data;

  6. Check and recheck the machining accuracy;

  7. Fitter setting process;

  8. Before finishing, align the reference surface of the process reference hole and check the allowance of the insert;

  9. Finish machining profile 2D, 3D, side punching profile and hole position, finish machining process reference hole and height reference, finish machining guide surface and guide hole;

  10. Check and recheck the machining accuracy.

  Jiangmen hardware accessories factory http://cyuy.cn//


国产精品一区二区,动漫| 免费h动漫无码网站| 被两个两个黑人吃奶4P视频| 真实国产乱子伦在线视频| 乱子的BBWBBW| 欧美人与禽交片在线观看| 热の无码热の有码热の综合| 亚洲无码看片| 欧美图片偷拍小说| 又色又污又爽又黄的网站| 成人午夜AV电影在线免费播放| 男人的天堂美女在线| 免费观看黄a级毛片| 欧美日韩成年人大黄片| а√天堂中文在线资源bt种子| 男女啪啪免费视频| 国产欧美婬乱一区二区| 东京热加勒比| 狠狠偷狠狠色| 欧美不卡无线在线一二三区观| 亚洲视频啪啪啪| 少妇人妻真实偷人精品| 18一19一级毛片| 久久发布国产伦子伦精品| 超碰人妻在线手机免费导航| 免费无码东京热| 69xxxx性日韩| 国产真实乱对白精彩久久| 一道本免费高清中字幕1V1| 日韩成人在线午夜| 亚洲欧美中文字幕日韩一区二区| 色欲色香天天天综合无码| 色天使色偷偷色噜噜噜| freesex日本少妇多毛hd| 四虎成人永久影院| 激情小说狠狠干| 国外处破女扒开特写第一部| 黑人扒开双腿国产精品| 风流老熟女一区二区三区| 日韩人妻无吗| 精品人妻无码一区二区|